
Throughout the life cycle of a project, we provide medium/long term site engineering resource, supervision, quality assurance, providing technical advice and setting out.
Our clients can rest certain that they will receive the necessary support and direction, as well as highly precise and reliable survey data at important phases of their projects, allowing complicated designs to build with confidence.
We may arrange for an initial site visit to establish survey control and architectural design site grid systems, as well as follow up visit to maintain control and assure project delivery success.
Setting Out resource
- Full time site Based Engineering Resource
- Site Engineer profile and experience report
- Full survey kit and laptop
- Engineering support structure and office support
- Quality Assurance
- Professional indemnity Insurance
We can build up site Based IT and office to serve your employees and sub-contractors throughout the project, reducing the chance of issues.
We give engineering technical support and guidance to our site based staff to guarantee that all work completed correctly and in accordance with current “Best practice” methods in order to fulfill our quality assurance standards.
To establish and maintain full Horizontal and vertical control, we use integrated GNSS, Robotic total stations, and precise leveling procedures.
Site Engineering and laying out
- To begin, create primary survey control Network
- Check/ verify the primary survey control that is already in place
- Architects Design Grid System that is the best fit for an existing structure
- Establish Gridline’s, Datum’s & FFL’s on Site.
- Verification of the Layout: As-Is Drawings
- As-Built Surveys are a type of construction verification.
- Quality Assurance/Validation Work by a Subcontractor
From primary survey control networks check/verify the control that is the currently in place.
Architects design grid system that is the best fit for an existing structure. On site, set up gridlines, datum’s, and FFLS verification plan. Drawings that have been prepared exactly as they are. Verification of the work surveys that are carried out as built. Quality control/validation work by a subcontractor.


Delivery/Output
- Technical Reporting.
- Weekly/Monthly Project Review Meetings.
- 2D & 3D AutoCAD DWG’s & PDF formats.
- Control Coordinates delivered in Excel format.
- Setting Out Verification: As-Set Out Drawings